Now comes YOUR job! Go out there with your plans and tape measure in hand. Add about 6" for gunite and plaster. it is wide, deep, long, etc enough? NOW is the time to change, fix, tweak as needed/wanted.
Kim![]()
Hmm.. interesting, hadn't thought of that really. We're so swamped in extras that have been sneaking up on this job that we haven't thought of adjustments to keep things in check budget wise.
Just the other day, we got a quote for another propane tank, except oh you know, our first tank is placed illegally. Great, so we now have the added cost of moving our first tank and the second, trenching, plumbing, etc.
Not a single thing has gone smoothly on this project..
You bring up a great point though, we're not changing after gunite obviously. With regards to 6", is this center on the steel or from the steel inwards on the pool? ie Steel to steel measurement minus 12" or minus 6" for interior distance