I need suggestions. My lame pool builder did not allow for an adequate expansion space between my stone coping and concrete slab. This is my first time to replace the caulking and I am finding there is no gap. The caulking is simply laid across the top in some areas. Any suggestions on how to cut in a gap? In some places, water will not even drain between them.




