Hello,
We had a bad leak in the gutter that required us to pull up the coping and back row of travertine. We had to grind off all of the thinset and mud from each piece as well as the beam. My question now is..... What is the most accurate way to ensure that the coping edge is pitched perfectly and absolutely level around the entire perimeter of the pool? Size is approx 50' x 18'. The original plans call for a mud bed with a slope. Pix attached and Thank you in advance!




We had a bad leak in the gutter that required us to pull up the coping and back row of travertine. We had to grind off all of the thinset and mud from each piece as well as the beam. My question now is..... What is the most accurate way to ensure that the coping edge is pitched perfectly and absolutely level around the entire perimeter of the pool? Size is approx 50' x 18'. The original plans call for a mud bed with a slope. Pix attached and Thank you in advance!



