Hello, I drained approximately 80% of pool water using pool math and refilled due to high CH levels. CH was at 825 ppm and city fill water is 90 ppm.
Chemistry levels now at:
CL 7
CC 0
Ph 7.8
TA 80
CH 210
CYA 50
WATER TEMP 71*
CSI INDEX -0.12
My CH is a little lower than recommended levels but it should be in range in a couple of months with evaporation and water refill levels at 90 ppm. Will the plaster be okay with CH lower than optimal level for a couple of months? It seems counterproductive to add calcium knowing my levels will rise with fill water.
Chemistry levels now at:
CL 7
CC 0
Ph 7.8
TA 80
CH 210
CYA 50
WATER TEMP 71*
CSI INDEX -0.12
My CH is a little lower than recommended levels but it should be in range in a couple of months with evaporation and water refill levels at 90 ppm. Will the plaster be okay with CH lower than optimal level for a couple of months? It seems counterproductive to add calcium knowing my levels will rise with fill water.