After spending a fair amount of time last year attempting to find a pool builder, and coming up unsuccessful(Most were 2+ years out, or willing to do it for insane amounts of money) - we decided to tackle this project ourselves.
The pool build is as follows:
-Pool Warehouse/Hydra Pools 20'x40' 42" steel wall kit, 6" corner radius
-7' Corner Step, liner over steel
-Auto365 Auto Pool Cover
-Hayward OmniLogic Cat5 Smart Phone controlled 40k Salt System
-Hayward TriStar 2.7HP Vs900 Pump
-Hayward C5030 Cartridge Filter
-2 AquaGenie Skimmers
-4 1.5" Hayward Color LED Lights
-Hayward H-Series 350k btu Heater
8' Diving Board
I will be contracting out the excavation(sort of a joint effort - my son and I have been able to help and we're having a lot of fun with it!), and the concrete decking - everything else will be done DIY.
As you will be able to see in the photos, there is a fair amount of regrading with the landscape to be done - and potentially a retaining wall in the deep end corner. I plan on installing french drains around the pool as well to control moisture.
We started the dig just over a week ago and have made good progress! Have the 42" depth dug in nearly the entire pool, will finish that tomorrow as well as digging the hopper.
I have one question at this point: On the deep end panels, everything is level and square. Even when we push the panels in as tight as they can go in the corners, we still measure to 20' 1/2". Is this normal? Maybe I am overlooking something?
Thanks in advance!
Joe










The pool build is as follows:
-Pool Warehouse/Hydra Pools 20'x40' 42" steel wall kit, 6" corner radius
-7' Corner Step, liner over steel
-Auto365 Auto Pool Cover
-Hayward OmniLogic Cat5 Smart Phone controlled 40k Salt System
-Hayward TriStar 2.7HP Vs900 Pump
-Hayward C5030 Cartridge Filter
-2 AquaGenie Skimmers
-4 1.5" Hayward Color LED Lights
-Hayward H-Series 350k btu Heater
8' Diving Board
I will be contracting out the excavation(sort of a joint effort - my son and I have been able to help and we're having a lot of fun with it!), and the concrete decking - everything else will be done DIY.
As you will be able to see in the photos, there is a fair amount of regrading with the landscape to be done - and potentially a retaining wall in the deep end corner. I plan on installing french drains around the pool as well to control moisture.
We started the dig just over a week ago and have made good progress! Have the 42" depth dug in nearly the entire pool, will finish that tomorrow as well as digging the hopper.
I have one question at this point: On the deep end panels, everything is level and square. Even when we push the panels in as tight as they can go in the corners, we still measure to 20' 1/2". Is this normal? Maybe I am overlooking something?
Thanks in advance!
Joe