Great. It looks like there's at least three days before chlorine so still going to be some waiting to swim. Also 30 days before salt or CYA so I guess a while before SWG and standard treatment protocols. I got my test kit ordered. TF-100 with Speedstir, pH meter, and salt test strips.
He's my summary of pool plaster best practices I'm going to provide based on their links to see if they take any exceptions and why if there are any comments before I provide it to them.
1. Cement/aggregate ratio to be one part cement to 1.5-1.75 parts aggregate (marble sand).
2. Water/cement ratio to be 0.48 or less.
3. Discard plaster that has been mixed for more than 90 minutes.
4. Limit use of calcium chloride set-accelerant as possible and not to exceed 2 percent to the amount of white cement.
5. Water not to be added to plaster surfaces while troweling except as trowel lubricant.
6. Plaster to be completed from bottom to top, floor then walls.
7. Delay pool fill six hours for plaster cure after plaster completion as possible.
8. No acid startup.
9. Balance fill water to a saturation index value in the range of -0.5 to +0.5.
10. Brush vacuums only. No wheeled vacuums.