Hello everyone. We are brand new to pool ownership. I maintained a pool when I was a kid at a house we lived in (my only job was really to just keep refilling the chlorinator when the tablets disappeared), but now I'm all grown up, and we just bought a house with a pool, and dove right into everything (pun intended.) Previous owners had let the pool go. it's a 36,500 gallon, concrete, in-ground pool. We just had it chemical washed, just had a new IntelliFlo VSF pump installed, I just rebuilt the entire bottom end of the Pentair filter with parts off amazon, new filter cartridges, a new cleaner robot... and we just finished refilling it with filtered water. We're currently in the process of balancing everything, and I was googling what settings to use for the tablet-based chlorinator, and immediately fell down the rabbit-hole learning about how the tablet-based system is awful, and how it'll drive up CYA, etc...
So now I'm annoyed because we thought we had gotten everything up to snuff, and I don't want to start ruining our perfect water. I've done some research, and I kind of want to try a liquid chlorine thingie (as opposed to an SWG for the time being). I see that a Stenner system is a popular choice. As far as I understand it, I could get one of the Stenner pump and tank combo thingies, hook that up, and then it would just be a matter of keeping Chlorine in the tank (I'm already aware of the downsides of this setup - mainly transporting chlorine, and how chlorine breaks down over time, etc...) but my main question, which I can't see to find a straightforward answer to, is this: could I literally just use the existing plumbing going to our Hayward dispenser? It pulls water after the pump, and dispenses it into the line after the heater right before everything goes back underground. Would the stenner system be as simple as running the Stenner system to those existing points, eliminating the need to really do anything other than plop the new system down, plug it in, and then figure out the settings?
Many thanks in advance, everyone!
So now I'm annoyed because we thought we had gotten everything up to snuff, and I don't want to start ruining our perfect water. I've done some research, and I kind of want to try a liquid chlorine thingie (as opposed to an SWG for the time being). I see that a Stenner system is a popular choice. As far as I understand it, I could get one of the Stenner pump and tank combo thingies, hook that up, and then it would just be a matter of keeping Chlorine in the tank (I'm already aware of the downsides of this setup - mainly transporting chlorine, and how chlorine breaks down over time, etc...) but my main question, which I can't see to find a straightforward answer to, is this: could I literally just use the existing plumbing going to our Hayward dispenser? It pulls water after the pump, and dispenses it into the line after the heater right before everything goes back underground. Would the stenner system be as simple as running the Stenner system to those existing points, eliminating the need to really do anything other than plop the new system down, plug it in, and then figure out the settings?
Many thanks in advance, everyone!