Contract signed...Should be swimming in April, NW Houston

Kim,

I just walked in the door, I would say they are 60% dug. I can see the contour for spa and sun shelf. They found an old tree stump I forgot about!! If the rain holds off they should set the shell Friday, we have 40-50% chance tomorrow though.

Too dark tonight for good Pictures.

John
 

Attachments

  • 20190403_204118.jpg
    20190403_204118.jpg
    224.2 KB · Views: 46
  • 20190403_204139.jpg
    20190403_204139.jpg
    254.8 KB · Views: 50
  • 20190403_204200.jpg
    20190403_204200.jpg
    238.1 KB · Views: 47
Can see the spray can though! Looks like they have been busy!! Forgot you cut that bad boy down did ya? LOL They are used to surprises like that. At least it was not big ole boulder!! Had one of those found on a dig............took a whole day just to get that bad boy out!

Kim:kim:
 

Enjoying this content?

Support TFP with a donation.

Give Support
John I am not sure I would even let them try to work on it. They are going to do even more damage to the surrounding yard and might even get stuck!! YUCK! Rain, rain, rain............go a way!! We have a hole to dig today!!!

Kim:kim:
 
okay! So the pool can sit in the front until the hole is purrfect then call in the crane for that fun :shock: time!!

Kim:kim:

Yes, like I told the construction manager yesterday. If we are ready for the pool Monday and they comeback and say it will be X days before we can get it out I will be more "Pee'd" than it sitting in the yard for a couple days...

I am home today and next week...

John
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.