First, everything we do is based on foundations built by others. So thanks to Bama Rambler, ChiknNutz, roadking00, gujjuman & others from previous posts who blazed trails and made my decisions easier.
Based on the above input I decided I would get a fixed speed Stenner 10 gpd pump because there would be less mechanical parts to maintain and more efficient operation. That meant some type of timer was in order. I hoped to control the pump from my Jandy power center, but found that it was maxed out on device capacity. So I settled for an outdoor digital timer from Ace Hardware. Costs so far:
45MPHP10 - Stenner Pump Total (with shipping):......$219.98
15 Gallon Plastic Drum Total:..............................$26.98
Digital timer (approximate):.............................. $15.00
...............................................................$261.96
The pump install is incredibly easy since Stenner includes tubing, fittings and check valve (plus a spare pump tube). The check valve assembly also has both 1/4" and 1/2" male pipe threads. Rather than drill a new hole in piping, I decided to utilise the secondary water inlet to the out of service "chlorinator". The electrical install is still a bit sloppy but I will later add an additional outlet near the stenner pump. But it will work fine for now. Here are a few pictures.
Overview
Inject point
Stenner pump and drum
Timer
Based on the above input I decided I would get a fixed speed Stenner 10 gpd pump because there would be less mechanical parts to maintain and more efficient operation. That meant some type of timer was in order. I hoped to control the pump from my Jandy power center, but found that it was maxed out on device capacity. So I settled for an outdoor digital timer from Ace Hardware. Costs so far:
45MPHP10 - Stenner Pump Total (with shipping):......$219.98
15 Gallon Plastic Drum Total:..............................$26.98
Digital timer (approximate):.............................. $15.00
...............................................................$261.96
The pump install is incredibly easy since Stenner includes tubing, fittings and check valve (plus a spare pump tube). The check valve assembly also has both 1/4" and 1/2" male pipe threads. Rather than drill a new hole in piping, I decided to utilise the secondary water inlet to the out of service "chlorinator". The electrical install is still a bit sloppy but I will later add an additional outlet near the stenner pump. But it will work fine for now. Here are a few pictures.
Overview

Inject point

Stenner pump and drum

Timer
