I'm considering adding to my existing concrete deck (where the river rock is located). It will include drilling rebar 'pinning' every 2 ft into the side of the existing deck to help prevent the new deck from rising above/falling below the existing deck. Because this would be within 5 ft of the water's edge, would this new section need to be bonded or added to the existing bonding?