Ok, getting ready to pour deck on Monday. There is still no drain pipe installed. I asked the pb about it and he now says he doesn't know.
I had asked early on in the plumbing layout for a drain pipe to the street from the pump so I could later have the ability to shut off skimmer pipe and empty the pool using the pump through the main drains.
He says he doesn't understand how it should go as in his 38 years building pools he has never done this before.
So, I guess I will just stub a 2" pipe up in the equipment pad (hopefully) near the pump. Then I guess put in a valve there to divert water away from the filter and out to street.
Sound about right?
It would just be a stub out away from the pad as I will be picking up the remainder of the pipe work later since the floor drain he originally thought he was going to use does not have the elevation drop needed. I will also have to pick up his overflow pipe as well for the same reason.
If I was the builder I'm pretty sure I would have checked that elevation a long time ago before making a decision to use it.
Doesn't anyone think ahead anymore? It needs to drop 5 3/4" for proper drainage. I guess I have my work cut out for me long after he is gone.
Now I'm off to set the fence posts for the equipment enclosure since he doesn't do that either. Fun, fun, fun around here. It's only supposed to hit 102 degrees today.