Vegas pool in planning stages.

Use extreme caution with the pucks. They're fine for a little while, but once your CYA reaches around 40 you will need to remove them and switch to liquid chlorine (bleach).

Sorry to hear about the SWG decision. I'm biased, I have one and love it. Not hard to add one later on when you decide to.
 
d4ce89a9eaf60ad3086e71ded6eaf03b.jpg
 
Outline was painted and approved. We just extended the second step bench on the long side to 6' and made the third step even with side of second step. The columns are 6' in from each side and stick into the pool about 6". I was thinking to move them in a little but stuck with where they are. Kids can play with them from the sun shelf
0765e3eea1e695bde6d638cbf36703b8.jpg


a7e8de2fe4a6a65870572d75928fc600.jpg


926b2da90168563ca2fc2a95f1d08f8d.jpg
 

Enjoying this content?

Support TFP with a donation.

Give Support
Decking is in just needs texture and color. Stone is in, the sample had more white pieces and some of these get a bit dark when wet so not sure how I'm feeling about them. I'll probably leave it and see how it goes over the first season. Dropped two little bottle trees in before the texture to avoid damaging the coating. Once they get established I'll trim them up a bit and get the stakes out.
7c529ea2e126f215cb25f847becaaf6a.jpg
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.