Screen Logic Programming

JBGpool

New member
Mar 27, 2020
3
San Diego
Hi,
I'm trying to set up my schedules so that the solar system does not come on until after start-up and the vacuum has run. Here's my idea:
7am - 8:30am Run vacuum (High Speed)
7:10 - 8:25am Move valve to vacuum position
8:29am - 3:29pm Circulate water (Lo Speed)
12pm - 3:15pm Allow solar heating (pump speed 2)*
3:15 Switch solar valve off*

Note that I don't want the system to close down at 3:30pm with the solar value in the "solar" position. Valve A (Pentair) is physically connected to the solar valve controller.
I had things running smooth without the solar heater. I added the first line in the attached schedule to try to accomplish the two * items.
Thanks,
John
 

Attachments

  • Scrren Schedule.PNG
    Scrren Schedule.PNG
    38.7 KB · Views: 7
  • Screen Features.PNG
    Screen Features.PNG
    22.9 KB · Views: 7
Looks like you are trying to program ScreenLogic on a phone. My understanding it is easier to program on a PC.

Maybe @Jimrahbe can help.
 
John,

I don't have solar, so I can't be sure how it will work, but I don't see anything obviously wrong with what you want to do..

Try it and let us know how it works.

Not sure if you have ScreenLogic on your PC or not, but it is much easier for me to program using the PC.. I never use my phone for programming.

Thanks,

Jim R.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.