Hi,
I'm trying to set up my schedules so that the solar system does not come on until after start-up and the vacuum has run. Here's my idea:
7am - 8:30am Run vacuum (High Speed)
7:10 - 8:25am Move valve to vacuum position
8:29am - 3:29pm Circulate water (Lo Speed)
12pm - 3:15pm Allow solar heating (pump speed 2)*
3:15 Switch solar valve off*
Note that I don't want the system to close down at 3:30pm with the solar value in the "solar" position. Valve A (Pentair) is physically connected to the solar valve controller.
I had things running smooth without the solar heater. I added the first line in the attached schedule to try to accomplish the two * items.
Thanks,
John
I'm trying to set up my schedules so that the solar system does not come on until after start-up and the vacuum has run. Here's my idea:
7am - 8:30am Run vacuum (High Speed)
7:10 - 8:25am Move valve to vacuum position
8:29am - 3:29pm Circulate water (Lo Speed)
12pm - 3:15pm Allow solar heating (pump speed 2)*
3:15 Switch solar valve off*
Note that I don't want the system to close down at 3:30pm with the solar value in the "solar" position. Valve A (Pentair) is physically connected to the solar valve controller.
I had things running smooth without the solar heater. I added the first line in the attached schedule to try to accomplish the two * items.
Thanks,
John