My PB missed adding the sun shelf to be 9”, so he’s adding the form and will pour concrete with rebar. How long will a tanning ledge of 6”, size of 12’x9’ take to cure for plaster? I’ve read 7-10Days to 28. My Pb says he can plaster very soon after but I’m concerned about the long term effects.