Unless you are 100% sure of your 0 CYA (like a new fill or something) I would start off with 3 lbs and retest a few days later.
4lb (recommendation was 88oz but I'm playing it safe as I can always add more later as JJ_Tex mentions) 100% CYA now dissolved into the 21k gal pool
Proceeding to do pH test and then will take corrective actions to place pH between 7.2-7.6 before adding LC.
1. It's my understanding that we should do the FC, CC test before we do the pH test, as a FC >= 10 (which is what happens during SLAM) makes the pH test useless. This essentially means we get to do the pH test only before the start of SLAM and NEVER during SLAM?
2. The reason why the pH test is necessary is because the LC added will be more effective when we start from a pH of 7.2-7.6.
3. For my specific case of FC = 0.5 this is irrelevant and I can test pH as much as I want before the start of SLAM but this is something worth keeping in mind in the future
4. Since I added the CYA, I will expect the TA and pH to have changed from the readings before addnig CYA
5. Since SLAM begins today, I have to add 2.6G LC to add to the pool to hit FC = 12. I am lazy so I will add 3G and that should land me at FC = 13
6. I will do a FC, CC test tonight before leaving and early tomorrow morning before the sun starts to hit the pool and this could be a good OCLT too? (maybe I am being too hasty as the algae will eat up the Cl overnight anyways)
Solid stabilizer need 48 hours or more to dissolve and circulate. Don’t wait until you get a CYA 30 reading. Assume the CYA is in the water when you start adding it and move on to add LC.
OK, will take a CYA reading Wednesday