We got the ledge supported with block grout poured underneath. It was a chore, we could have done better as there is one small spot where some air got trapped and created a void resulting in a hollow spot. I knew I'd probably have to take a few lumps along the way, I had really hoped to have done better with this part. I'm living with it as there's not much more to do I suppose, until if/when it becomes an issue.
Pool is running! Well it has been for a few days now, but everything (well not everything, but the important stuff) is running. Started with just pump/filter, then added in communication line to IC for the pump, lights, temp sensors and wireless connection. Just brought the SWG online yesterday. Overall I found the IC setup pretty painless, I was able to fumble through most areas to get equipment set up and on schedule, only had to reference the docs a time or two. Salt is at 3650ppm per the cell. FC is at 3. TA is high at 190 (was 220) even after adding 42oz of Muriatic Acid per the Pool Math app. It has only been about 12 hrs since I added the Muriatic Acid, maybe I should wait longer to test? PH was 8.1-8.2, seems to have come down some where around 7.8. CH is 200.
Prior to bringing the SWG online, I had been adding liquid chlorine to keep the water clean. Despite my efforts it dipped and dived from 1-5. Once it hit 4 I brought the SWG online and set it to 25% for the first day, then once it hit 3 I increased to 50%. CYA was at 50 and I added some last night. Need to test it in a few days. Any recommendations as to where to run the SWG?
We have gravel mostly around waiting to get on our concrete guy's schedule. We are planning on using 6x6 WWM and the fiberglass rods provided to connect the concrete to the fiberglass shell. We are going to pour 12" thick about 12" out from the wall then taper out to 4", 3' wide total. While I was initially going to go this route to add a bit more strength and to capture the deck jets, now I'm just hoping this buy's me some more time to install coping/pavers

. A few more lines to run for a future slide and the deck jets then we can cover it all up and run our bonding wire.