- Jun 2, 2019
- 337
- Pool Size
- 16200
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Hayward Aqua Rite (T-15)
I just checked out the coping now that it is done... and I noticed that the crew that did it has CUT the ground or bonding wire in MANY places around the entire pool (I lost count!!) and therefore there is now no continuity. I honestly don't know if it's a grounding or bonding wire.. so I feel stupid. But it's the copper wire that was put all around the pool in one of the first phases when they put in the shell framing.
That sounds extremely bad to me..... but I don't know a thing.
I sent the pics and a message to our project manager, and will see what he says. He probably thinks I am nuts.
But how are they going to fix that? It is cut in at least 6 places around the perimeter of the pool!! And its already backfilled so it's not like you can just easily run new wire.
I don't want our PM to tell me another "that's normal" as he has been saying to a lot of my questions along the way. This one REALLY concerns me and thus I am here... what is the RIGHT way for them to fix this? I want to be educated and demand they fix it RIGHT and not halfway. Please help!
That sounds extremely bad to me..... but I don't know a thing.
I sent the pics and a message to our project manager, and will see what he says. He probably thinks I am nuts.
But how are they going to fix that? It is cut in at least 6 places around the perimeter of the pool!! And its already backfilled so it's not like you can just easily run new wire.
I don't want our PM to tell me another "that's normal" as he has been saying to a lot of my questions along the way. This one REALLY concerns me and thus I am here... what is the RIGHT way for them to fix this? I want to be educated and demand they fix it RIGHT and not halfway. Please help!
Last edited: