Hi Everyone-
I have narrowed down my PB to 2 companies. I haven't signed or started anything yet. I am located in Nassau County, NY. Approx 11,300 Gallons.
Company 1- 13X26 In ground Steel Walled pool, Vinyl Liner of Choice, Built in Steps Full Width of Pool, Poolcrete, Underwater LED light change color, Cartridge Filter System, Heater, Salt Water System, Total Cost - $30,000
Company 2 - 13x26 In Ground Concrete Walled Pool, Vinyl Liner, Builtin Steps Full Length of Pool, Bench in deep section, Vermiculite, 2 Automatic Skimmers, 4 return Jets, and 2 main drains, One Jandy 1 1/2 HP Filter Pump, One Jandy DE 48 filter and 2” multiport One Jandy JXi gas heater, 400,000 BTU and electronic ignition, One Jandy Aquapure salt water chlorine generator, One Jandy RS8 automated control system with internet control and cover link to control chlorine production when cover closed.
Two Pool Lights to be LED energy saving and color changing., One Aquaclean robotic pool cleaner, One Stainless Steel Handrail for Steps
Maintenance kit, start up chemicals, start up of pool and demonstration of all equipment is included. Total $42,200
One is must more detailed because Company 2 is the actual PB and sub out masonry. Company 1 is utilized by the design team on tons of projects so that quote is from my Landscape/Mason Contractor whom he does tons of pools for.
Are there any pro/cons to either or am I fine either way as long as the PB is competent? I'm trying to get more specifics for Company 1 now but I know they use Hayward products. Thanks!!
I have attached a design layout. THX

I have narrowed down my PB to 2 companies. I haven't signed or started anything yet. I am located in Nassau County, NY. Approx 11,300 Gallons.
Company 1- 13X26 In ground Steel Walled pool, Vinyl Liner of Choice, Built in Steps Full Width of Pool, Poolcrete, Underwater LED light change color, Cartridge Filter System, Heater, Salt Water System, Total Cost - $30,000
Company 2 - 13x26 In Ground Concrete Walled Pool, Vinyl Liner, Builtin Steps Full Length of Pool, Bench in deep section, Vermiculite, 2 Automatic Skimmers, 4 return Jets, and 2 main drains, One Jandy 1 1/2 HP Filter Pump, One Jandy DE 48 filter and 2” multiport One Jandy JXi gas heater, 400,000 BTU and electronic ignition, One Jandy Aquapure salt water chlorine generator, One Jandy RS8 automated control system with internet control and cover link to control chlorine production when cover closed.
Two Pool Lights to be LED energy saving and color changing., One Aquaclean robotic pool cleaner, One Stainless Steel Handrail for Steps
Maintenance kit, start up chemicals, start up of pool and demonstration of all equipment is included. Total $42,200
One is must more detailed because Company 2 is the actual PB and sub out masonry. Company 1 is utilized by the design team on tons of projects so that quote is from my Landscape/Mason Contractor whom he does tons of pools for.
Are there any pro/cons to either or am I fine either way as long as the PB is competent? I'm trying to get more specifics for Company 1 now but I know they use Hayward products. Thanks!!
I have attached a design layout. THX
