I have been putting stalling our pool build because it's too cold to swim, but I am wondering how soon I actually have to fill the pool with water. Right now we are done with our second inspection and ready for plaster and water whenever I choose. Do I have to fill the pool right away when the plaster is done? I am getting Quartzscapes which is an exposed aggregate and it requires an acid wash and pressure wash. Is that done the same day they shoot the quartz plaster and then they fill it with water?