UPDATED - Concrete Poured on SJ Build - Pictures included
Well the last week has been brutal. The PB has been all over the place with the liner - it was ordered a month ago they sent back four times for updates on measurements and still they screwed it up.
Also the heater is 2 feet from the property and the set backs are 5! The gas and electric were already run so that has to be fixed - now that we passed the gas line inspection this morning they can move the heater tomorrow.
So what the problem was revolved around the step on the tanning ledge. The owner came over yesterday and it appears the step was two inches to the right more than the liner. The reason was PB measurements although correct on distance from step to end of tanning ledge were incorrect on the diagonal dimensions - kafko didn't catch it and made the liner 14" instead of 12" from step to ledge.
The owner came and said remove step and build new one bc liner company is saying 1 1/2 weeks for new one. The construction guy said shave off two inches which they did. They came back today after it dried and its now missing two inches on the other side. Seems obvious to us right??
Sooo now today they added the two inches to the other side.
Water is filling - should be foamed and sealed tomorrow in area of step.
Here's some pics.
http://images.tapatalk-cdn.com/15/06/11/8255bccde017722dd1b3e66bc8f56674.
Here's beginning of water..
[IMG]http://images.tapatalk-cdn.com/15/06/11/4b45769653be87ccae4ec32399cf142e.jpg
Sent from my iPhone using Tapatalk