Re: UPDATED - Concrete Poured on SJ Build - Pictures included
It has been a long lull, but we are moving forward. Kafko apparently is way behind on the manufacturing of the pool liners. I am not sure I am buying this BUT regardless here we are and we are making progress.
I met with Lee who is building the waterfall - we had the option of upgrading the waterfall already purchase by having 1 foot or 2 feet of the waterfall 'falling' onto the existing stamped concrete to give the allusion that it is more natural. I looked at some pictures, and without this it was much to much of a 'straight line' look for me which contrasted sharply with the free form look of my pool. Therefore I decided to do 6 inches on each side. in talking with him about our 'jump rock' and the best time to deliver so he can complete the process and place for us, it occurred to me that he probably can get the jump rock himself, saving me the scheduling of the delivery, the time with it sitting on my lawn on top of the river rock, and the cost of delivery and placement with the PB. He said he could completely do that, and obviously it would match perfectly with the waterfall, and he would place it also. Also he is adding the anchors so we can cover it for the winter, and a light which I really loved the look of on this forum, so I insisted. Unfortunately he will only do white, but he says when I want a more subtle look - I can turn off the LED's and use the soft lighting of the waterfall at dusk and it will be beautiful. I can't wait to see how this all turns out, but I am really in love with the designing and what we have chosen to do, I hope when it comes to fruition I like it this much.
So he is on his way out there now (of course he isn't coming tomorrow like he thought b/c then FOR ONCE in the pool build I would get to be home and watch something happen). Now, the in-laws will have to deal with my constant requests for pictures and progress, and change this or that!
So I had a deep conversation with the PB on Monday about the lack of communication and the vinyl etc. I also relayed my concerns with the Pentair Masterflow. He said they have no concerns at all with me getting the Raypak somewhere else and they would still install it and run the gas/electric/plumbing. I spoke to the owner of another PB and he hooked me up. Got a great price on the 406 with cupro-nickel and they are delivering today.
Once the heater arrives, they will lay the concrete pad and install the plumbing, the electrician will be out in the next few days, and the gas next Tuesday. So that part is coming along, permit still outstanding.
As for the liner so we can all see the pool with WATER in it, they should ship it Monday, and its overnight, so hopefully a week from today, we will see the liner begin to be installed.
I will post pictures later of the waterfall and jump rock. The concrete still looks amazing, even better than I thought and I love the shape even more day to day!
Thanks again for you all following my build..