11 days ago the PB texted me at 7AM, to say the electricians will be out at 11AM to finish. I tell him to call them off as I didn't want anyone working at my house (COVID) and I was unaware until the day of. In addition, the dirt around my equipment pads was heavily saturated mud. So at 11:30AM electricians are at my door with the PB. This PB is really testing my patience. Well, the electric is done and they made a mess. Plumber now has to come back and reset the pads and pressurize the plumbing. After doing my walk around, I realized the electricians mistook a water pipe for a light fixture and removed a cap opening up the sealed pressurized plumbing. Or they jacked up something on the equipment pads and caused a leak. Then needed to release the pressure and cut a capped pipe. Of course, I tell the PB and he says it's ok they will remove the caps for plaster. No sheet!!! My pool won't be plastered for at least 2 more weeks. Looking at 2"- 4" of rain over the next 4 days.
Pool step marker tiles were set.
I need to install a removable gated fence around the pool. Then I can have the pre-plaster inspection done. Has anyone done something like this?
Angel Guard Pool Fencing of Southern California | Pool Fences Cost is $2400 for 118' of 5' high fence with a locking gate.
I know the shell isn't sealed, but these areas where there is water coming in due to rain seem like areas where plaster will separate first.
View attachment 131510View attachment 131511View attachment 131512
View attachment 131513