Greetings, new member here.
I bought my pool this spring and choose the Baquacil system. I have not had any issues, but I really wanted a salt water system. I let the local company talk me out of it. My mistake .
I want to convert to using salt next spring, and so I really don't want to add any more baq. chemicals if I don't need to. The starter kit came with CDX, but I have not used it other than the initial startup dose that was in the kit.
What process should I use to close out my pool? Should I close it using the Baquacil chemicals? Should I just cover it up, drain the majority of water in the spring and then start the conversion process or??
Looking for guidance and opinions. My pool is a 28' doughboy above-ground. I have the doughboy in-wall entry system (in-wall steps) if that matters (I can't imagine that it does, but I do not want to leave out anything.)
I bought my pool this spring and choose the Baquacil system. I have not had any issues, but I really wanted a salt water system. I let the local company talk me out of it. My mistake .
I want to convert to using salt next spring, and so I really don't want to add any more baq. chemicals if I don't need to. The starter kit came with CDX, but I have not used it other than the initial startup dose that was in the kit.
What process should I use to close out my pool? Should I close it using the Baquacil chemicals? Should I just cover it up, drain the majority of water in the spring and then start the conversion process or??
Looking for guidance and opinions. My pool is a 28' doughboy above-ground. I have the doughboy in-wall entry system (in-wall steps) if that matters (I can't imagine that it does, but I do not want to leave out anything.)