I am doing a remodel (extended the pool to add a baja and leveled the pool floor slope a little). The shotcrete was done and I wasn't given any instructions. Three days after, I read that it was supposed to be kept wet to cure. I verified with the contractor and on the 4th day started watering. I see cracks, big holes etc. Is this normal or is this a problem (pics from 4th day)? Thanks!
Attachments
Last edited: