Our PB had the EasyTouch 4 in the initial plan and when I advised that I wanted independent control of the pool lights, spa light, bubbler light, sheers, bubblers, spa blower and have capacity for future landscaping lights, he said we would need the ET8. (We did not further upgrade to the Intellicenter and are ok with the ET8 decision).
Our pool was just filled with water last week and none of the lights operate independently. When I asked the PB, he said that it would have required additional transformers and actuators which were not included in my price.
I am of course extremely frustrated with this answer as it was not brought to our attention that we would need anything additional for the functionality that we wanted. Nowhere in the contract does it state what functionality would come with the build; not even the current functionality is spelled out, so how would we have known to be specific to ask for additional transformer and actuators?
Part of me thinks the PB is covering up missed communications and not wanting to fix it. But dealing with them makes my blood boil a bit so in parallel, I'm now trying to see if perhaps it would be something that I could just directly hire an electrician to do.
Does anyone have any experience with getting the independent functions that we want and how difficult is it? TIA
Our pool was just filled with water last week and none of the lights operate independently. When I asked the PB, he said that it would have required additional transformers and actuators which were not included in my price.
I am of course extremely frustrated with this answer as it was not brought to our attention that we would need anything additional for the functionality that we wanted. Nowhere in the contract does it state what functionality would come with the build; not even the current functionality is spelled out, so how would we have known to be specific to ask for additional transformer and actuators?
Part of me thinks the PB is covering up missed communications and not wanting to fix it. But dealing with them makes my blood boil a bit so in parallel, I'm now trying to see if perhaps it would be something that I could just directly hire an electrician to do.
Does anyone have any experience with getting the independent functions that we want and how difficult is it? TIA