- Apr 23, 2009
- 103
- Pool Size
- 8800
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-30
I was reading in another thread that you can schedule to only have your spillway run for a few hours rather than all the time. From looking at my system, I don’t think the builder set it up for this feature, and I don’t see an option in the menu. Below I’ve posted some pictures of my system, do I need to modify my plumbing to be able to schedule this feature?





