So, pool has been drained and the entire pool is being resurfaced with new pebblecrete. The artificial rocks are being resurfaced and textured around the perimeter also. While the pool is drained the lights are being repositioned as well as channel cut for additional pool lighting/wiring. Concrete around the pool limits adding more returns without great expense sadly.
Is there anything else that I should look at doing while the pool is in this state? Can't think of much else below the waterline while drained....
https://photos.app.goo.gl/tp7ygmNGHGPRZTAK6
https://photos.app.goo.gl/WQwE4BY1PRap21Tq8
https://photos.app.goo.gl/VdG7dzMx3BKrBfzT7
Thoughts?
F
Is there anything else that I should look at doing while the pool is in this state? Can't think of much else below the waterline while drained....
https://photos.app.goo.gl/tp7ygmNGHGPRZTAK6
https://photos.app.goo.gl/WQwE4BY1PRap21Tq8
https://photos.app.goo.gl/VdG7dzMx3BKrBfzT7
Thoughts?
F
Last edited: