Current plans do not include plans to remove the deck. The plan is to put pavers over the existing concrete.
I have read the Expansion Joints and Coping document, and from what I understand, I have a cantilever concrete deck. That tile cap is the part that is confusing me, as it appears to be attached to the deck. If I use a paver on top on that deck and a tile under that paver, then I think I'll have issues with the tile cracking down the road. If I use the remodel paver, it would hang over the side of said concrete, much like the cap tile did, and then I can use 6x6 tile under it without issue, other than my water line may leave the tile underwater and also soak the remodel coping, which isn't ideal. The paver installers all say I don't need to do that, just move my tile line up and put 6x6 tile or an 8 in glass tile in it's place. (by taking a 12x12 sheet and cut off 4 in).
Bottom line, I don't want to wait until the pool refinish starts, to have a coping plan in place. If I do, the refinish timeline can get very long.