My pool was refinished on July 14 and started on July 15th after filling all night. Pool builder said to wait 4 weeks before installing SWG.
I've purchased a AutoPilot RC-42 from Josh at saltpoolguys.com that I want to install. I'm thinking of doing the install this weekend. That would make it 5 weeks after the refinish. Should I wait longer?
Below are my test results from this past Saturday. Water looks great. No more dust when brushing the pool. I do have to add about 2 cups of acid a day. I need stablizer to get my CYA increased. What else should I be concerned with?
FC = 5.0
CC = .0
pH = 7.8
TA = 60
CH = 350
CYA = 45
Water temp = 85
Salt = 800 (none has been added)
Thanks
Ken
I've purchased a AutoPilot RC-42 from Josh at saltpoolguys.com that I want to install. I'm thinking of doing the install this weekend. That would make it 5 weeks after the refinish. Should I wait longer?
Below are my test results from this past Saturday. Water looks great. No more dust when brushing the pool. I do have to add about 2 cups of acid a day. I need stablizer to get my CYA increased. What else should I be concerned with?
FC = 5.0
CC = .0
pH = 7.8
TA = 60
CH = 350
CYA = 45
Water temp = 85
Salt = 800 (none has been added)
Thanks
Ken