I've been a bad boy and have been relying on flow switch for cell operation. Want to use the mechanical timer that is not in use as primary now. ChatGPT has given a great starting point but looking for any instruction from the smart folks here.
As far as I know its 120V. Also, talk to me like i'm a 5 year old with electrical stuff if you would please.Follow the wiring diagram on the door label.
Your SWG powered by 120V or 240 V?
Go ask your parents what SWG you have.As far as I know its 120V. Also, talk to me like i'm a 5 year old with electrical stuff if you would please.
I deserve that oneGo ask your parents what SWG you have.
Putting two wires under one CB is against code.It's 240 per the breakers
And what model SWG are we discussing?I deserve that oneIt's 240
Okay, obviously I didn't do the wiring. It's original from the build. Both pump and control panel are wired into same breaker.Putting two wires under one CB is against code.
Did a 5 year old do that wiring?
Hayward Aquarite 900And what model SWG are we discussing?
Okay, obviously I didn't do the wiring.
By control panel, you mean the Aquarite SWG control panel?It's original from the build. Both pump and control panel are wired into same breaker.
Yes, by control panel I mean the SWG control panel.It was not obvious to me who did the wiring.
By control panel, you mean the Aquarite SWG control panel?
Are you the 5 year olds parent?Yes, he's referring to the SWG panel. See how this thread is much better than anything AI can do for you?
Thats why I come here. Trying to get all the information before dealing with power.For simplicity make sure everything is set to 240 then get the wiring done correctly. Yes, he's referring to the SWG panel. See how this thread is much better than anything AI can do for you?