Problem during pebble finish spray

kasino08

Member
Jul 21, 2019
11
Tampa, FL
Hello all,
Our pool builder began spraying our pebble finish today but ran into an issue with their equipment, which forced them to stop spraying about halfway through. The walls and steps still look unfinished and they didn’t get any of the floor done.

Is this going to give me issues later on since they’re coming back tomorrow to finish up? I would assume this needs to be finished in one step. My pool builder didn’t pick up when I called, so I don’t know how they’re going to handle it. Thanks for your input.
 
Here are two pictures of what it looks like. I’m really hoping it’s not a big deal. Thank you.
 

Attachments

  • FAB1DD09-81F5-4493-BFBC-3FC879B8EFD0.jpeg
    FAB1DD09-81F5-4493-BFBC-3FC879B8EFD0.jpeg
    114 KB · Views: 67
  • A275922F-CBD9-4C34-9A56-9CC1CAA081BC.jpeg
    A275922F-CBD9-4C34-9A56-9CC1CAA081BC.jpeg
    105.5 KB · Views: 63
Here’s a few more close up pictures.
 

Attachments

  • 3E62FF52-5F82-4D98-ABE7-3FA3B1AD1B67.jpeg
    3E62FF52-5F82-4D98-ABE7-3FA3B1AD1B67.jpeg
    152.5 KB · Views: 48
  • BFD0E379-C463-4DBD-82FA-B1392996B42B.jpeg
    BFD0E379-C463-4DBD-82FA-B1392996B42B.jpeg
    154.3 KB · Views: 48
  • C98A3711-5453-4C54-8725-0CDA33EC4B57.jpeg
    C98A3711-5453-4C54-8725-0CDA33EC4B57.jpeg
    165.6 KB · Views: 46
Plaster is applied in two passes. The first pass is spread thin and forced into the shell. It's job is to adhere and allow the second pass to be applied without sloughing off.

I don't see your situation being an issue since they'll be coating the entire pool again anyway.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.