Primera stone plaster...is this going to be a problem?

Sahmad786

Well-known member
Nov 5, 2021
45
Dallas, TX
Pool Size
17000
Surface
Plaster
Chlorine
Liquid Chlorine
Primera stone is a 2 step process. Plaster day 1, acid wash and polish day 2.

They plastered today and were done a few hours. They had tape to protect the pool but it came loose. Went out this evening and see this.

Is this a problem?
 

Attachments

  • 20220718_195918.jpg
    20220718_195918.jpg
    274.7 KB · Views: 35
  • 20220718_195908.jpg
    20220718_195908.jpg
    320.5 KB · Views: 36
Discuss it with the crew in the morning. The polishing should clean up a lot of it. They use hydraulic operated sanders.
Be sure to have them do the vertical walls (especially if you have a bench) and the steps as I found they focused more on the seating areas and floor and had to have them do a second pass on the some of the vertical walls.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.