The in ground pool was drained and resurfaced about 35 days ago. Diamondbrite finish. So far we added chlorine a couple of days ago as directed by the vendor. The SWG is now producing chlorine. The ph is high so we added muriatic acid. In what order should I be adding chemicals based on my Taylor test results? Should I get the ph under control before adding CYA? I am in Central FL.