One last question (yeah right) on the bonding, the panel documentation shows a dotted line for bonding on the ground bus bar with the line going to both the neutral bus and the ground bus. I was going to remove the bonding wire that is connected to the bonding lug on the pump and connect a new bonding wire from the SWG to the pump bonding lug. So no bonding should be on the grounding bus like it is currently wired?
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.
Welcome to TFP! For a wealth of pool care information please check out our free Pool School. If you are in need of specific help then we encourage you to Register and ask us here in the forum!