Pool equipment delivered today. No SWG came, apparently it is on backorder with Hayward and no ETA. I'm fairly annoyed to be missing stuff, seeing as a signed my contract with them way back in February, but I get that times aren't exactly normal.
Pool company says they are going ahead with the schedule and will come back to install the SWG when it's available. I get that I couldn't use it for 30 days after the pool was filled anyway, but is there anything I should be mindful of when they install the equipment without the SWG?
I guess I need to stock up on liquid chlorine in the meantime, although I'm not sure how much I'll need. I have 6 gallons to start. Hopefully it comes back in stock soon!
Pool company says they are going ahead with the schedule and will come back to install the SWG when it's available. I get that I couldn't use it for 30 days after the pool was filled anyway, but is there anything I should be mindful of when they install the equipment without the SWG?
I guess I need to stock up on liquid chlorine in the meantime, although I'm not sure how much I'll need. I have 6 gallons to start. Hopefully it comes back in stock soon!