now that i got the pool, i wanted to work the ground and get things level. so i tilled up the ground and got it pretty level using a long 2x4 with a 4ft level attached. i was very surprised at how close i was actually able to get. so i have tamped the ground and put some pavers under where the legs will go. if no rain tomorrow i am going to dig down under the pavers to set them down so i can put my anti-fatigue mats under the pool. i wont be putting the mats down until spring but would like to get this all done now so i wont have to worry about much when it is time to put pool up.