I added polyquat to my pool before closing 5 days ago. CYA was 40 so I added it at half SLAM level, which is 8 ppms. After running the pump for 24 hours, I tested my water and FC was only 3 ppm, which is the minimum FC level for my CYA. When I used polyquat last year, it only lowered the FC by 3 ppms so this was a bigger FC loss than I expected. I know that you aren't supposed to bump the FC back up to half SLAM level before closing because chlorine degrades polyquat so I went ahead and closed. Did I make the right choice about this or should I have added chlorine to bump it back up to 8 ppms? I've been worried every since closing because the water temperature was 65 degrees when the polyquat was added, highs have been in the upper 70s this week, and I've got a mesh cover that probably doesn't block out all of the sun like a solid cover does.
When I lower the water level to below the skimmer in a few days, would it help if I added some liquid chlorine and mix it in with my sump pump or should I avoid doing this because the chlorine will degrade the polyquat? If we end up having a warm winter like we had last year, should I add liquid chlorine when I drain water out every 6-8 weeks or should I not do this because there is polyquat in the water?
When I lower the water level to below the skimmer in a few days, would it help if I added some liquid chlorine and mix it in with my sump pump or should I avoid doing this because the chlorine will degrade the polyquat? If we end up having a warm winter like we had last year, should I add liquid chlorine when I drain water out every 6-8 weeks or should I not do this because there is polyquat in the water?