Our pool is a 60+ year old kidney shaped pool, 30k gallons, with major plaster issues and a plumbing leak between the skimmer and pump. The pool has one return line which is 1.5" copper (original) and a 1.5" PVC line from the skimmer to the pump, and is a pain to keep clean. Going to contract out a new pebble finish but plan to do the plumbing myself and also replace the light.
The pink area on the picture below is the cement decking I will be removing to do the re-plumb. The rest of the deck will be removed but not for several years when we redo the entire backyard.
Looking for some guidance:
The pink area on the picture below is the cement decking I will be removing to do the re-plumb. The rest of the deck will be removed but not for several years when we redo the entire backyard.
Looking for some guidance:
- How many returns do I need?
- Where would you place the returns? Positioning and depth?
- Would one high-volume skimmer do the trick or do I need a second?
- If a second skimmer, where should I put it? (Or add it when the entire deck is replaced in the future?)
- What size pipes?
- Anything I am missing?


