So i finally got started on my build. I'm on day 4. Day 1 was moving 375 yards of clay garbage soil and cursing it the entire way. I expected to hit water table but I did not which is good but I would have rather had good soil and dealt w the water issue. Day 2 was strictly moving dirt. I started filling my buddies tri-axle at 9am on Sunday morning and we hauled 13 stuffed loads 5 miles away in just over 4 hours. Took a lunch break when the guy taking fill had enuff and then hauled 3 more loads 12 miles away. Days 3 and 4 were myself and 2 employees figuring out how to put this kit 2gether. Would have had it all done if not for bad soil. I got serious clay mud issues and I kinda regret starting this project. If not for letting wife and 2 kids down I wouldn't have continued I would have backfilled and finished patio and retaining wall as planned. Rain 2nite which is gonna destroy this site I am gonna have days of cleanup and dry time b4 I can continue. I'll update in a few days