The excavator used a much larger bucket than I would have thought. Its a mess but probably what is necessary to get the job done right.
My plumbing plan calls for 5 pipes.
2 return far wall. 1 on near wall to pump.
2 skimmers.
Everything is 2" rigid solid core PVC.
I intend to pitch everything to the pump with the only low spot being just before the pump area. Here I plan to use a window well (grey tube you see) as a pit for reaching the plugs I will have here before the pipe goes up to the pump/filter.
If all goes as planned, all I will need to do to winterize the pool is plug up the ports and skimmer at the pool, lift the cover to the well pit, and unscrew the plugs to let them drain out. I wont risk broken pipes again that put me in this situation.
I'm probably doing it the hard way but it makes sense to me.
Oh and it rained hard today :/
My plumbing plan calls for 5 pipes.
2 return far wall. 1 on near wall to pump.
2 skimmers.
Everything is 2" rigid solid core PVC.
I intend to pitch everything to the pump with the only low spot being just before the pump area. Here I plan to use a window well (grey tube you see) as a pit for reaching the plugs I will have here before the pipe goes up to the pump/filter.
If all goes as planned, all I will need to do to winterize the pool is plug up the ports and skimmer at the pool, lift the cover to the well pit, and unscrew the plugs to let them drain out. I wont risk broken pipes again that put me in this situation.
I'm probably doing it the hard way but it makes sense to me.
Oh and it rained hard today :/