July 9th. Finally starting to get the yard in shape. Still have more trees to plant. The pool has had a slight leak from the day they filled it. They have drained in twice. Once to go over all penetrations again, pressure test again, reseal lights, etc. The second time since that didnt work they drained it to apply a product called Akron. Still didnt work, same rate of leak. About 2 inches in 24 hours. I think it is a crappy plaster job installed on a rainy day. At least the PB is really actively working to resolve it. Next step is to let it leak until it stops. Hopefully the PB will step up and replaster if need be. Has anyone had a similar problem?