Got 7 yards of topsoil down, fertilizer, and 25lbs of bahia grass seed. Watering it 2-3 times a day, hoping to get decent grass growth. Still have to get the cap stones for the retaining wall and radius them in, paver store i want to use has been on vaca for a couple weeks. Keep trying to catch the pool 1mm out of level but it's not happening. Deck using 6x6 posts coming soon to a pool near me. Trying to get some1 to clean up their Crud seen in the backyard lol, so that's another project.

