UPDATE: The crew fixed the position of the pool. They gunited around 1/3 of the floor yesterday, despite knowing that the pool was out of position. As you can imagine, I'd prefer that they rip everything out and start from fresh ground. The excavation company wants to to drill holes into the slab 4 inches deep and insert rebar to tie into the rest of the pool.
I believe rebar CAN be used to tie into an existing slab, but I'm not sure that I trust the crew to do it properly. The construction super for the PB is supposed to call me, and I'm sure to convince me that it's fine to tie into the existing slab.
I did water the slab this morning and will again after the crew leaves for the day, just in case this does end up being part of the pool. I figured there would be construction issues with building a pool, but I never envisioned this one.
View attachment 128937View attachment 128938