We still have 3 LONG months before our pool install is started. Since I am an utter planning fool, would it be in my best interest to test my tap water to give me a baseline of where we are starting?
I am also wondering if I should let the PB balance the pool with the chemicals upon start up and then take it to BBB from there on my own. Would letting him add his own chemicals make BBB easier or more difficult?
I am also wondering if I should let the PB balance the pool with the chemicals upon start up and then take it to BBB from there on my own. Would letting him add his own chemicals make BBB easier or more difficult?