Going on month 9 of our install from Anthony Sylvan. 18x36, 11000 gal with spa and ansylbrite finish. Pool has been leaking since filling in November and it looks like they finally located a problem with drains in spa. They are jackhammering, hydraulic cementing new drains and then plaster patching. Been a nightmare so far. Cant wait to be up and running and hope that finish matches and that long term problems don't arise from this patch/repair.
Anyone have experience with situations like this?
Anyone have experience with situations like this?