Ok so I got a more detailed quote if we could get a second or third set of eyes on it please I deleted the original post in its entirety.
Imagine Inspiration 35’
Filtration
- 1 surface skimmer
- 2 Graeme Baker approved main drain sump pumps
- 3 wall type return inlets
- all plumbing to be glue weld pressure type solid or flex schedule 40
Equipment
- 4x8’ concrete pad
- Hayward vs super pump
- s244 24” sand filter with 300lbs media and 1.5” multi port valve
- Hayward 25k swg
- Hayward summit xl heatpump
Those are kind of the nuts and bolts on the pool side. We’re doing pavers for the decking and a couple retaining walls and an aluminum fence.
Seem reasonable?
Imagine Inspiration 35’
Filtration
- 1 surface skimmer
- 2 Graeme Baker approved main drain sump pumps
- 3 wall type return inlets
- all plumbing to be glue weld pressure type solid or flex schedule 40
Equipment
- 4x8’ concrete pad
- Hayward vs super pump
- s244 24” sand filter with 300lbs media and 1.5” multi port valve
- Hayward 25k swg
- Hayward summit xl heatpump
Those are kind of the nuts and bolts on the pool side. We’re doing pavers for the decking and a couple retaining walls and an aluminum fence.
Seem reasonable?
Last edited: