please help. new pool owner here. pool is new. pool has been full for about 2 weeks, only the last full week has the pump been running. construction crew did not set equipment until after pool was full. pool has been vacuumed to remove construction debris, filter cleaned, only chemicals added so far was by the pb 4 bags salt, 3 or 4 shock, and that was done without any testing done. we tested later and have tested the following results so far, I can do more. just a little overwhelmed . ph 8.4. fc 10. ta 200 cya 00. tested today.
yesterday was cl 5 ppm. ph 8.2.. added 1.5 lb dry acid.
please advise me of what to do next.
happy mother's day and thanks
yesterday was cl 5 ppm. ph 8.2.. added 1.5 lb dry acid.
please advise me of what to do next.
happy mother's day and thanks