Having Stonescape installed I was aware of the different phases of the build, however.
Mini Stonescapes was being applied today and next thing I see is crews chipping 2 inches away under the tile at the waterline, around all fixtures, and around tile on steps. The sundeck had a 2sq' section removed looking as they began to chip away but stopped.
Called my contractor and he said something went wrong but he didn't know what, I will see him after the weekend as today is Saturday. My contractor did reassure me the end product will be beautiful.
What should I expect, does all the Stonescape need removed? If they plaster over what they did will it cause a problem in the future?
Out of all the crews and tradesmen building my pool I'd say the crew applying the final product that everyone sees should be more skilled than any, but yet these guys didn't seem so
Mini Stonescapes was being applied today and next thing I see is crews chipping 2 inches away under the tile at the waterline, around all fixtures, and around tile on steps. The sundeck had a 2sq' section removed looking as they began to chip away but stopped.
Called my contractor and he said something went wrong but he didn't know what, I will see him after the weekend as today is Saturday. My contractor did reassure me the end product will be beautiful.
What should I expect, does all the Stonescape need removed? If they plaster over what they did will it cause a problem in the future?
Out of all the crews and tradesmen building my pool I'd say the crew applying the final product that everyone sees should be more skilled than any, but yet these guys didn't seem so