- Jul 14, 2017
- 736
- Pool Size
- 24000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Hayward Aqua Rite (T-15)
I just got my welcome packet in preparation for a pool renno in the spring - including replastering.
Startup instructions say to maintain a calcium level of 125-175 ppm for the first 14 days. After 14 days levels should be higher (225-375 ppm).
I am curious why they want it so low for the first two weeks. Anybody know?
Startup instructions say to maintain a calcium level of 125-175 ppm for the first 14 days. After 14 days levels should be higher (225-375 ppm).
I am curious why they want it so low for the first two weeks. Anybody know?